Martin Road Widening Project on Redstone Arsenal, AL
J&A performed land surveying, civil engineering design and preparation of construction plans for widening a primary access roadway (approximate length of 2.0 miles) into Redstone Arsenal by adding two new lanes to the existing two-lane roadway, extending existing culverts, and adding a new two lane bridge. Additionally, a separate plan set for utility relocation was required and bid to clear the existing utilities from the roadway construction area prior to roadway work. Maintaining the security and accessibility of the various restricted areas required unique considerations.