Jeff Road/US Highway 72 Intersection Improvements, Huntsville, AL

As part of a roadway widening project, J&A performed traffic analysis and signalization plans for this state maintained intersection. The design included 4 new signal poles, 65 foot and 75 foot mast arms, new signal controller, and new quadrupole sensor loops. The project was completed on a “fast track” schedule of 3 months.

Spring Avenue and Beltline Road Intersection Improvement Project, City of Decatur, AL

Preparation of construction plans for improvements of an existing intersection to provide additional capacity and facilitate traffic flow (approximately 900 feet) including widening to a 5 lane section with curb and gutter. Additional tasks included: preparation of legal descriptions and tract maps for approximately 8 parcels, utilities relocation assistance, traffic analysis and signalized intersection design. Estimated Construction Cost: $0.7 million.